INFRA TEGUH SOLUTION is a Selangor–based contractor registered with CIDB since 2023, holding active certification . We deliver reliable building, civil engineering, and mechanical & electrical solutions—combining proven site experience with quality workmanship and compliance to Malaysian standards.
Infra Teguh Solution, established in early 2023, is a 100% Bumiputera-owned company registered as a CIDB G4 contractor and duly recognized by UPEN and the Ministry of Finance (MOF). We focus primarily on civil engineering and infrastructure works, delivering services such as:
Backed by a team of skilled professionals and guided by values of integrity, quality, and innovation, we are committed to executing every project with precision and reliability. Our expertise allows us to support both government and private sector clients, ensuring projects are delivered on time, within budget, and to the highest safety and quality standards.
| PPK Registration No | 0120230627-SL120520 |
|---|---|
| Membership Since | 27/06/2023 |
| Registration Validity | Until 26/06/2028 |
| Certificates | PPK ✓ • SPKK ✓ • STB ✓ |
| Grade | G4 |
Verification available upon request. *Info berdasarkan rekod pendaftaran kontraktor CIDB.
The proposed project involves the construction of a 500kV double-circuit overhead line (OHL) connecting key substations to enhance the regional power transmission network. The line will run from PMU Bentong South to PMU Lenggeng (Point M to Point L), and subsequently from PMU Lenggeng to PMU Mahkota Cheras (Ampe to Point L). This infrastructure upgrade aims to improve power transfer capacity, reliability, and system stability between these critical points in the grid, supporting future demand growth and integrating renewable energy sources effectively. The project includes the installation of transmission towers, conductors, and necessary protective equipment along the designated route. It will also involve alignment surveys, environmental assessments, and coordination with relevant authorities to ensure compliance and minimal environmental impact. Overall, this upgrade is a vital step in strengthening the region's electrical backbone and ensuring sustainable power delivery.
PahangThe proposed project involves the construction of a 500kV dual-circuit overhead line (OHL) connecting the PMU Bentong South to PMU Lenggeng (Point M – L), followed by further extension from PMU Lenggeng to PMU Mahkota Cheras (Ampe – Point L). This high-voltage transmission line aims to enhance power stability and capacity between these key points within the regional grid, ensuring reliable electricity supply and supporting ongoing infrastructure development. The project specifications detail the route and technical design for efficient and safe installation of the power line across designated points, contributing to the overall grid improvement plan.
PahangThe project involves the installation of a 500 kV double-circuit overground high-voltage transmission line extending from PMU Bentong South to PMU Lenggeng (Point M – L), followed by a segment from PMU Lenggeng to PMU Mahkota Cheras (Ampe – Point L). This infrastructure upgrade aims to enhance the reliability and capacity of the power transmission network in the region, supporting increased energy demands and facilitating future expansion. The line will connect key substation points, ensuring efficient power flow and system stability across the designated routes. The project scope includes the design, procurement, construction, and commissioning of the overhead line and associated components, conforming to safety and technical standards.
PahangThe proposed project involves the construction of a 500kV double-circuit overhead transmission line (OHL) in Negeri Sembilan, encompassing slope stabilization and drainage works to ensure environmental resilience and structural stability. The project aims to facilitate high-voltage power transmission across the region, supporting urban development and industrial growth. Specific activities include integrating advanced slope stabilization techniques, implementing effective drainage systems to prevent erosion and flooding, and minimizing environmental impact during construction. The scope also covers the excavation, grading, and site preparation necessary for supporting the overhead line structures, alongside related ancillary facilities. This infrastructure upgrade is pivotal for strengthening the national power grid and enhancing energy reliability for Negeri Sembilan and surrounding areas.
Pahang
Civil engineering construction
Project management for infrastructure works
Slope protection & rehabilitation works
Soil investigation, grouting, micropiling
Roadworks & general maintenance
Director
Project Manager
PROJECT MANAGER
PROJECT ENGINEER
Telephone:
Fax:
-
Registered Address:
11A, JALAN SERI BAIDURI 3 TAMAN SERI BAIDURI BANDAR TEKNOLOGI KAJANG
, 43500, Hulu Langat, Selangor
Correspondence Address:
11A, JALAN SERI BAIDURI 3
, TAMAN SERI BAIDURI
, BANDAR TEKNOLOGI KAJANG
, 43500, Hulu Langat, Selangor